Road changes near you - cycle hangars, parking bays and play streets: 23 September 2026

Eight traffic orders, 81 changes to Hackney's streets — and three schemes you can still object to

8 traffic orders affect 81 locations across the borough, and 3 are still open to objection. Hover over or tap a marker for the details. Every location is listed below with its consultation window and, where the council has published one, a link to the order.

Hackney traffic orders, 23 September 2026

Hover over or tap a marker to see the details here. Every location is also listed below.

  • Street layout schemes 4
  • Cycle hire bays 36
  • Cycle hangars 17
  • Parking bay changes 14
  • Electric vehicle bays 2
  • Play streets 8

Solid marker: the order has been made. Ring marker: proposed. Each scheme below carries its own advertised dates, because objection periods differ between schemes and are not all 21 days. Markers show the street affected, not the exact position of an individual bay, and are nudged apart where icons would otherwise overlap; the list below carries the exact street for every location.

All locations by scheme

TT1929 · Queensbridge Road walking and cycling Open to objection until 9 October

Advertised 18 September to 9 October 2026

Objections, stating the grounds, to streetscene.consultations@hackney.gov.uk by 9 October 2026

  • Queensbridge Road — Floating bus stops with zebra crossings, five raised tables and 250m of raised cycle track; permit bays removed along both kerblines
  • Mapledene Road — 1.8m of permit bay removed at 341 Queensbridge Road and replaced with double yellow lines
  • Jacaranda Grove — 6m of shared use bay removed at 325 Queensbridge Road and replaced with double yellow lines

TT1935 · Cycle hangars, batch AG Open to objection until 9 October

Advertised 18 September to 9 October 2026

No draft order document is published for this scheme (checked 5 October 2026)

Objections, stating the grounds, to consultation.parking@hackney.gov.uk by 9 October 2026

  • Hertford Road — 2.5m of permit bay at the side of 30 De Beauvoir Square replaced with a cycle hangar
  • Killowen Road — 2.5m of permit bay at the side of 29 Cassland Road replaced with a cycle hangar
  • Buckingham Road — 2.5m of residents' parking outside No. 61 replaced with a cycle hangar
  • Belgrade Road — 2.5m of permit bay outside No. 79 replaced with a cycle hangar
  • Banister House — 2.5m of double yellow lines replaced with a cycle hangar
  • Foulden Road — 2.5m of permit bay outside Nos. 19 and 21 replaced with a cycle hangar
  • Dunlace Road — 2.5m of residents' parking outside No. 55 replaced with a cycle hangar
  • Powell Road (No. 2) — 2.5m of permit bay outside No. 2 replaced with a cycle hangar
  • Barbauld Road — 2.5m of residents' parking outside No. 37 replaced with a cycle hangar
  • Fletching Road — 2.5m of permit bay outside No. 41 replaced with a cycle hangar
  • Cotesbach Road — 2.5m of permit bay outside No. 43 replaced with a cycle hangar
  • Colenso Road — 2.5m of permit bay outside No. 17 replaced with a cycle hangar
  • Kynaston Road — 2.5m of permit bay outside No. 10 replaced with a cycle hangar
  • Charnock Road — 2.5m of permit bay outside No. 7 replaced with a cycle hangar
  • Wilberforce Road — 2.5m of permit bay outside No. 54 replaced with a cycle hangar

TT1930 · EV rapid chargers, phase 5B Open to objection until 16 October

Advertised 18 September to 16 October 2026

No draft order document is published for this scheme (checked 5 October 2026)

Objections, stating the grounds, to streetscene.consultations@hackney.gov.uk by 16 October 2026

  • Hackney Road — 29.8m of shared use bay on the north side replaced with electric vehicle charging bays opposite No. 184
  • Amhurst Park — 29.8m of permit bay on the north side replaced with electric vehicle charging bays opposite Nos. 61-63

TT1917 · Parking 2026 batch 7 Order made, in force 28 September

In force 28 September 2026

No order document is published for this scheme (checked 5 October 2026)

  • Mintern Street — Personalised permit bay outside No. 61 Buckland Court converted to a personalised disabled bay
  • Arden Estate — Existing orders amended to correct anomalies between markings and orders
  • Branch Place — Existing orders amended to correct anomalies between markings and orders
  • Parkholme Road — Disabled bay outside No. 11 replaced with a residents' parking space
  • Brenthouse Road — Disabled bay outside No. 8 replaced with a permit bay
  • Forest Road — Disabled bay outside No. 40 replaced with a residents' parking space
  • Albion Road — Two cycle hangars outside Nos. 33 and 37 replaced with residents' parking spaces
  • Thistlewaite Road — Disabled bay outside No. 33 replaced with a permit bay
  • Powell Road — 2.5m of double yellow lines at the side of No. 105 Downs Road replaced with a cycle hangar
  • Cricketfield Road — Cycle hangar opposite No. 78 replaced with a permit bay
  • Narford Road — Personalised permit bay outside No. 54 replaced with a permit bay
  • Rhodes Estate — Existing orders amended to correct anomalies between markings and orders
  • Lordship Road — 13.5m of double yellow lines outside Nos. 53 and 55 replaced with a permit bay
  • Church Walk — 5m of permit bay at the side of No. 10 replaced with two cycle hangars moved from Albion Road
  • Queen Elizabeth's Walk — 5m of permit bay outside Nos. 23 and 25 replaced with double yellow lines
  • Filey Avenue — Disabled bay outside No. 42 replaced with a personalised permit bay

TT1919 · Cycle hire amendments 1 In force since 21 September

In force 21 September 2026

No order document is published for this scheme (checked 5 October 2026)

  • King John Court — New 5m cycle hire bay replacing resident permit parking north of Holywell Lane
  • Luke Street — New 4.1m cycle hire bay replacing permit parking near Nos. 35-41
  • Falkirk Street — New 4.5m cycle hire bay replacing permit parking west of Stanway Court
  • Eagle Wharf Road — 4.6m of cycle hire bay removed and returned to permit parking near Nos. 49-59
  • Eagle Wharf Road (Bracklyn Street end) — New 5m cycle hire bay replacing shared use parking near Bracklyn Street
  • Ufton Grove — 5m of cycle hire bay removed; a new 11.1m bay replaces a car club bay
  • Southgate Grove — 5m of cycle hire bay removed; a new 9.3m bay created at 76 Southgate Road
  • Richmond Road — New 5m cycle hire bay replacing permit parking west of 24 Mayfield Close
  • Malvern Road — Cycle hire bay removed; 5m returned to permit parking near 33 Albion Drive
  • Eleanor Road — New 5m cycle hire bay replacing shared use parking south of 256 Richmond Road
  • Horton Road — Cycle hire bay removed; 5m returned to permit parking near Nos. 41-42
  • Reading Lane — 5.1m of solo motorcycle bay converted to a cycle hire bay near Florfield Road
  • Clissold Crescent — 5m of cycle hire bay removed at Medway House; new 5m bay created to the north east
  • Belfast Road — Cycle hire bay removed; 4.9m returned to permit parking near Nos. 2-4

TT1920 · Cycle hire phase 5, batch 1 In force since 21 September

In force 21 September 2026

No order document is published for this scheme (checked 5 October 2026)

  • Westgate Street — 13m of shared use parking replaced with a cycle hire bay near No. 27
  • Sheep Lane — 8.1m of shared use parking replaced with a cycle hire bay near 35 Andrews Road
  • Lansdowne Drive — 5.9m of permit parking replaced with a cycle hire bay near 1 Elmbridge Walk
  • Stamford Road — Cycle hire bay removed: 5m returned to shared use parking at Kingsland Road
  • Wilton Way — 5m of permit parking replaced with a cycle hire bay east of Parkholme Road
  • Durrington Road — 7m of permit parking replaced with a cycle hire bay south of Colne Road
  • Wordsworth Road — 5m of shared use parking replaced with a cycle hire bay near 2 Matthias Road
  • Amhurst Road — 12.3m of shared use parking replaced with a cycle hire bay near Stoke Newington Road
  • Kingsmead Way — 10m of permit parking replaced with a cycle hire bay north west of Homerton Road
  • Rushmore Road — 5m of permit parking replaced with a cycle hire bay west of Pedro Street
  • Oswald Street — 5m of permit parking replaced with a cycle hire bay south of Millfields Road
  • Millfields Road — 5m of permit parking replaced with a cycle hire bay east of Glyn Road
  • Hollar Road — 5m of shared use parking replaced with a cycle hire bay east of Stoke Newington High Street
  • Sewdley Street — 5m of resident permit parking replaced with a cycle hire bay near Nos. 1-1A
  • Walford Road — 5m of permit parking replaced with a cycle hire bay east of Nevill Road
  • Meeson Street — 5m of permit parking replaced with a cycle hire bay east of Adley Street
  • Adley Street — 5m of permit parking replaced with a cycle hire bay near 49 Marsh Hill
  • Alkham Road — 5m of permit parking replaced with a cycle hire bay near Nos. 1-8
  • Osbaldeston Road (No. 89) — 5m of permit parking replaced with a cycle hire bay north of Cazenove Road
  • Rossington Street — 5m of permit parking replaced with a cycle hire bay near 161 Northwold Road
  • Osbaldeston Road (opposite Nos. 49-68) — 5m of permit parking replaced with a cycle hire bay at Broad Common Estate
  • Trehurst Street — 5m of permit parking replaced with a cycle hire bay near 72 Ashenden Road

TT1925 · Nile Street In force since 21 September

In force 21 September 2026

No order document is published for this scheme (checked 5 October 2026)

  • Nile Street — Prohibition of driving introduced between Britannia Walk and Provost Street, permit bays and single yellow lines replaced with double yellow lines and kerb blips

TT1936 · Play streets, Car Free Day Ended 20 September

In force 18 September 2026 · Play streets 10am to 6pm on 20 September

No order document is published for this scheme (checked 5 October 2026)

  • Albion Drive — Play street from Queensbridge Road to outside No. 52, 10am to 6pm on 20 September
  • Ellingfort Road — Play street along the entire length, 10am to 6pm on 20 September
  • Bradbury Street — Play street along the entire length, 10am to 6pm on 20 September
  • Milton Grove — Play street from Allen Road to Albion Grove, 10am to 6pm on 20 September
  • Thistlewaite Road (play street) — Play street along the entire length, 10am to 6pm on 20 September
  • Nevill Road — Play street from Kynaston Road to Dynevor Road, 10am to 6pm on 20 September
  • Woodmill Road — Play street from Bramble Court to Bamboo Court, 10am to 6pm on 20 September
  • Portland Rise — Play street from Henry to Green Lanes, 10am to 6pm on 20 September

Source: London Borough of Hackney notices of proposal and notices of making, TT1917, TT1919, TT1920, TT1925, TT1929, TT1930, TT1935, TT1936; consultation windows from the notices and Hackney’s Traffweb consultation site, read 21 September 2026. Boundary: London ward boundaries, GLA and ONS, © Crown copyright and database right. Hackney publishes traffic orders through Traffweb, which sorts them by stage rather than by reference number; search there by street or TT number.